top of page
GLGP Water Project
Flooded/Damaged Roads
Photos taken October 2019 after boards were reinstalled.
* No water was present on September 1st after boards were removed for 2 months.
*Water table did not drop until boards were removed again in May 2020, even though the snow melt occurred and over 19 inches of rain was received.
* These saturated roads were frozen causing damage to the asphalt and base.
bottom of page